Tuesday, 26 January 2010

The Beeginning!

The table saw arrived on time and was duly assembled. Screwfix are great! 18 hours from order to delivery!

The planks for the sides and ends of the hive are sawn to length and glued together and held with sash-cramps while the glue is drying (to be left for 24 hours).

The legs have been cut to length too.

I hope to make the follower boards soon, which will be used as a profile for the assembly of the main hive box. I think I'll make a spare follower to use as a template for further hives and for a follower/feeder.


Should be something worthy of a photograph soon!

No comments:

Post a Comment